THE SUPERCONDUCTING SUPER COLLIDER PROJECT


The Scientific and Technical Electronic Repository
The History of the Project
The Utilization of the SSC Assets - Proposed Projects

The Superconducting Super Collider Laboratory was a DOE supported facility.
The U.S. House of Representatives decided in 1993 to halt the project after
14 miles of tunneling were completed and two billion dollars spent.
The laboratory, located South of Dallas, TX, is in the final shutdown phase.